    Two new JCB 3CX excavators are delivered to Nicolson Plant Ltd from dealers Scot JCB in Aberdeen. These two 3CX's will replace the existing ones that are based in the Sullom Voe Oil Terminal.


Connected through our plant hire division we undertake Civil Engineering Contracting. We carry out projects from large road schemes to simple house site clearance with values ranging from 0.5 M to 1 K. With the backup of having our own plant hire, haulage and quarry facilities we can ensure that a high standard and efficient service is provided to our customers.

Previously we have carried out:

* Water main, Sewer and Cable track schemes
* Road Schemes
* House Site clearance
* Demolition
* Site muck shifting
* Coastal protection
* Field drainage

Current Contracts


Name: Sullom Voe Power Station Civil Modifications
Client: Fortum (O&M) UK Ltd.
Role: Main Contractor
Timescale: Jan 2007 - 5 month duration

Fortum (O&M) UK ltd. operate the Sullom Voe power station on behalf of BP is in the process of upgrading and renewing a lot of the plant at the power station. With these modifications there is civil works required to accommodate the new plant.

Our scope includes: installing foundations for two new steam boilers, two 42m3 reinforced concrete bases for new water treatment tanks, an 80m3 reinforced concrete base for a new 27m high chimney, various other small bases for ancillary equipment, 250m of water main track and install a drainage system.


Name: Whiteness Burial Ground
Client: Shetland Islands Council Infrastructure Services Department
Role: Sub-Contractor
Timescale: Sept 2006 - 8 month duration

Main earthworks, road construction, divert water main, protection of BT, various small concrete works, kerbing, etc.


Name: Trondra Road Improvements
Client: Shetland Islands Council Infrastructure Services Department
Role: Sub-Contractor
Timescale: June 2006 - 8 month duration

Main Earthworks, Road Construction, Divert Water Main, Protection of BT, Install new Water main and BT Ducts, Various small concrete works, Kerbing, etc.


Name: Civil and Building Maintenance of the Sullom Voe Oil Terminal
Client: BP Exploration Operating Company Ltd
Role: Main Contractor
Timescale: 3-year contract

We are currently the Main Contractor for the Civil and Building maintenance contract at the Sullom Voe Oil Terminal, Mossbank, Shetland. This contract involves civil engineering and building maintenance, maintenance of roads and pavements, cleaning of surface and underground drains and execution of civil project activities. To successfully achieve this we provide experienced and trained civil tradesmen and plant operators who are managed by our Contract Manager and Supervisor. We also provide various items of plant and vehicles to serve the contract.


 